Skip to content

Bathroom remodeling

Bathroom remodeling in Winston-Salem, NC

We remodel bathrooms from a straightforward refresh through to a full strip-out and rebuild. Every project starts with a conversation about how the room is used, what frustrates you about it now, and what you want to spend.

A remodeled bathroom with a wood vanity, freestanding bath, and tiled shower

What the work covers

  • Strip-out and disposal of existing fixtures and finishes
  • Layout planning, including moving fixtures where the plumbing allows
  • Waterproofing and substrate preparation before tiling
  • Tiling to walls and floors
  • Vanity, toilet, tub, and shower installation
  • Trim, paint, and final fixture fitting

Your options

Refresh or full remodel

A refresh keeps the layout and replaces finishes and fixtures. A full remodel opens up the possibility of moving things — but relocating drainage is the part that adds the most work, so we always talk it through before you commit.

Layout

Small bathrooms usually gain the most from a layout change: swapping a tub for a walk-in shower, moving a door swing, or rethinking where the vanity sits.

Materials

We help you choose tile, vanity, and fixtures that work together and are realistic to maintain. Bring samples or inspiration images and we will tell you honestly how they will behave in the room.

What affects planning and cost

We do not publish prices, because a renovation price that ignores the actual space is a guess. These are the things that genuinely move the number on this kind of project.

  • Whether fixtures stay where they are or move
  • The condition of what is behind the tile — water damage is the most common surprise
  • Tile size and pattern, which changes how long setting takes
  • Fixture and vanity selections and their lead times
  • Whether this is the household's only bathroom

How the project runs

  1. 1

    Walkthrough and plan

    We look at the room, talk through the layout, and agree on the scope before pricing.

  2. 2

    Selections and schedule

    You finalise tile and fixtures. We confirm the sequence of work and when the room will be out of use.

  3. 3

    Build and hand back

    Strip-out, preparation, tiling, fitting, and a final walkthrough together.

Related work

Approved project photography is still being collected, so these are marked as preview images rather than presented as completed client projects.

Questions about bathroom remodeling

All frequently asked questions

Free estimate

Get an estimate for your bathroom remodeling project

Send us the basics and we will get back to you to arrange a walkthrough. No obligation, and no pressure afterwards.

What happens next

  1. 1. We read your request and get in touch the way you asked.
  2. 2. We arrange a time to look at the space and measure up.
  3. 3. You get an estimate based on what is actually there.

Prefer to talk it through?

(336) 893-4447
How should we get back to you?
Timeframe (optional)

Sending this asks us to get in touch — it does not book an appointment. We only use your details to reply to your enquiry.